DEMO
This is a demonstration of the cabinet. Real access is granted as soon as the contract is signed — we create the account and you receive an invitation by email.
Client cabinet
Your projects
Dighomi House
In progress · 285 m²
Vake Residence
Completed · 420 m²
Dighomi House
In progressPrivate house · 285 m² · Dighomi, Tbilisi · 02.2026 — 11.2026
Complete
62%
NB
Nika Beridze
Project manager · +995 32 200 00 00
Download the full archive (ZIP)
Album PDF
Progress3/7
Photo record12
Documents18
Reports3
Album48
Stage status
Design
✓ Complete
Substructure
✓ Complete
Frame and slabs
✓ Complete
Building services
74%
Facade and glazing
35%
Finishes
Planned
Handover
Planned
Daily log
22.08.2026
9 · 4 ⬚
Ventilation risers installed on the second floor; wet areas tanked
Certificate No. 8 — concealed works
21.08.2026
8 · 3 ⬚
Back boxes fitted; cable containment run
20.08.2026
11 · 5 ⬚
Underfloor heating circuit pressure tested; screed prepared
Certificate No. 7 — pressure test
19.08.2026
7 · 2 ⬚
Glazing openings surveyed and the order confirmed
Documents are retained for ten years after completion. Only the client and the project manager have access — every download is logged.
Sign in to the cabinetContact your manager